Oops! This site has expired. If you are the site owner, please renew your premium subscription or contact support.

         DMR Civil Engineering PLLC  

  Civil Engineering Design,PLLC

Roof Stabalization Plans-304 N. Perry Johnstown NY Sign In or Register to add photos

The roof was partially burnt due to a fire within the building. After a structural analysis was performed it was determined that the roof could be re-stabilized rather than completely removed, thus saving the owner thousands of dollars.
0
0
0
1 - 3 of 3 Photos
Rss_feed